| Sl.No. |
flat No. |
floor No. |
Completion Status |
Sold Status |
Carpet Area(in m sq.) |
Ownership |
|
1
|
A1-001-G13 |
Ground |
Under Process
|
Yes
|
189.00 |
Ritika Printech Pvt Ltd |
|
2
|
A1-002-G14 |
Ground |
Under Process
|
No
|
169.00 |
Krishna Kumar |
|
3
|
A1-003-G15 |
Ground |
Under Process
|
No
|
125.00 |
Moti Infraheights Pvt Ltd |
|
4
|
A2-004-G12 |
Ground |
Under Process
|
Yes
|
107.00 |
Pankaj Kumar |
|
5
|
A2-005-G5 |
Ground |
Under Process
|
No
|
107.00 |
Sahelini Devi |
|
6
|
A2-006-G4 |
Ground |
Under Process
|
Yes
|
107.00 |
Pankaj Kumar and Poonam |
|
7
|
A3-007-G3 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
8
|
A3-008-G2 |
Ground |
Under Process
|
No
|
169.00 |
Niraj Kumar |
|
9
|
A3-009-G1 |
Ground |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
10
|
A4-010-G9 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
11
|
A4-011-G11 |
Ground |
Under Process
|
No
|
124.00 |
Moti Infraheights Pvt Ltd |
|
12
|
A4-012-G10 |
Ground |
Under Process
|
Yes
|
107.00 |
Deepika Birendra Singh |
|
13
|
A5-013-G7 |
Ground |
Under Process
|
Yes
|
185.00 |
Arun Kumar and Seema |
|
14
|
A5-014-G8 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
15
|
A1-101-13 |
First |
Under Process
|
No
|
189.00 |
Moti Infraheights Pvt Ltd |
|
16
|
A1-102-14 |
First |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
17
|
A1-103-15 |
First |
Under Process
|
No
|
125.00 |
Gautam Kumar and Pritam Kumar |
|
18
|
A2-104-12 |
First |
Under Process
|
Yes
|
107.00 |
Sangita Sinha and Prabhakar Sinha |
|
19
|
A2-105-5 |
First |
Under Process
|
Yes
|
107.00 |
Rameshwar Singh and Sangeeta Singh |
|
20
|
A2-106-4 |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
21
|
A3-107-3 |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
22
|
A3-108-2 |
First |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
23
|
A3-109-1 |
First |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
24
|
A4-110-9 |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
25
|
A4-111-11 |
First |
Under Process
|
Yes
|
124.00 |
Anup Kumar Srivastava and Anupama Srivastava |
|
26
|
A4-112-10 |
First |
Under Process
|
Yes
|
107.00 |
Aditya Narayan Singh and Jyoti Shikha |
|
27
|
A5-113-7 |
First |
Under Process
|
Yes
|
185.00 |
Suresh Prasad Bhagat |
|
28
|
A5-114-8 |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
29
|
A5-115-6 |
First |
Under Process
|
Yes
|
107.00 |
Kumari Anjali Dubey and Sriniwas Dubey |
|
30
|
A1-201-13 |
Second |
Under Process
|
Yes
|
189.00 |
Rajesh Kumar Tewary |
|
31
|
A1-202-14 |
Second |
Under Process
|
Yes
|
169.00 |
Rakhi Devi |
|
32
|
A1-203-15 |
Second |
Under Process
|
No
|
125.00 |
Gautam Kumar and Pritam Kumar |
|
33
|
A2-204-12 |
Second |
Under Process
|
Yes
|
107.00 |
Priti Bala and Manoj Kumar |
|
34
|
A2-205-5 |
Second |
Under Process
|
Yes
|
107.00 |
Ratna Srivastava and Ritesh Kumar Srivastava |
|
35
|
A2-206-4 |
Second |
Under Process
|
Yes
|
107.00 |
Santosh Kumar Sharma |
|
36
|
A3-207-3 |
Second |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
37
|
A3-208-2 |
Second |
Under Process
|
Yes
|
169.00 |
Deepa Srivastava |
|
38
|
A3-209-1 |
Second |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
39
|
A4-210-9 |
Second |
Under Process
|
No
|
107.00 |
Niraj Kumar |
|
40
|
A4-211-11 |
Second |
Under Process
|
No
|
124.00 |
Ravi Kumar |
|
41
|
A4-212-10 |
Second |
Under Process
|
No
|
107.00 |
Niraj Kumar |
|
42
|
A5-213-7 |
Second |
Under Process
|
Yes
|
185.00 |
Antriksh Kumar and Meha Mansi |
|
43
|
A5-214-8 |
Second |
Under Process
|
No
|
107.00 |
Kuldeep Kumar |
|
44
|
A5-215-6 |
Second |
Under Process
|
Yes
|
107.00 |
Shivjit Kumar and Anjusha Prasad |
|
45
|
A1-301-13 |
Third |
Under Process
|
Yes
|
189.00 |
Ekta Malik |
|
46
|
A1-302-14 |
Third |
Under Process
|
Yes
|
169.00 |
Ekta Malik |
|
47
|
A2-304-12 |
Third |
Under Process
|
Yes
|
107.00 |
Ambooj Suman |
|
48
|
A2-305-5 |
Third |
Under Process
|
No
|
107.00 |
Balmati Devi |
|
49
|
A2-306-4 |
Third |
Under Process
|
No
|
107.00 |
Naresh Kumar Ram |
|
50
|
A3-307-3 |
Third |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
51
|
A3-308-2 |
Third |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
52
|
A3-309-1 |
Third |
Under Process
|
Yes
|
169.00 |
Upnit Shree |
|
53
|
A4-310-9 |
Third |
Under Process
|
No
|
107.00 |
Ravi Kumar |
|
54
|
A4-311-11 |
Third |
Under Process
|
Yes
|
124.00 |
Aparna Asthana and Amit Kumar Asthana |
|
55
|
A4-312-10 |
Third |
Under Process
|
Yes
|
107.00 |
Sanjay Singh and Manisha Pallavi Chouhan |
|
56
|
A5-313-7 |
Third |
Under Process
|
No
|
185.00 |
Shiv Shankar Sahu |
|
57
|
B2-1004-B4 |
Tenth |
Under Process
|
No
|
85.00 |
Manu Ram Kashyap |
|
58
|
B2-1005-B5 |
Tenth |
Under Process
|
No
|
85.00 |
Manu Ram Kashyap |
|
59
|
B2-1006-B6 |
Tenth |
Under Process
|
Yes
|
85.00 |
Ritesh Kumar |
|
60
|
B3-1007-B7 |
Tenth |
Under Process
|
No
|
99.00 |
Ranjan Kumar |
|
61
|
B3-1008-B8 |
Tenth |
Under Process
|
No
|
99.00 |
Ranjan Kumar |
|
62
|
B3-1009-B9 |
Tenth |
Under Process
|
No
|
99.00 |
Ranjan Kumar |
|
63
|
B4-1010-B10 |
Tenth |
Under Process
|
Yes
|
89.00 |
Surabhi Kumari and Niraj Kumar |
|
64
|
B4-1011-B11 |
Tenth |
Under Process
|
No
|
89.00 |
Ravi Kumar |
|
65
|
B4-1012-B12 |
Tenth |
Under Process
|
No
|
61.00 |
Piyush Prasad |
|
66
|
B4-1013-B15 |
Tenth |
Under Process
|
Yes
|
89.00 |
Sujit Kumar and Shalini Kumari |
|
67
|
B4-1014-B14 |
Tenth |
Under Process
|
Yes
|
99.00 |
Madhu Narayan and Richa Srivastava |
|
68
|
B4-1015-B13 |
Tenth |
Under Process
|
No
|
61.00 |
Piyush Prasad |
|
69
|
B1-1101-B2 |
Eleventh |
Under Process
|
No
|
99.00 |
Ashish Kumar and Prakash Saurav |
|
70
|
B1-1102-B1 |
Eleventh |
Under Process
|
Yes
|
99.00 |
Preeti Kumari Sinha |
|
71
|
B1-1103-B3 |
Eleventh |
Under Process
|
No
|
89.00 |
Shivratan Sahu |
|
72
|
B2-1104-B4 |
Eleventh |
Under Process
|
Yes
|
85.00 |
Vivek Singh |
|
73
|
B2-1105-B5 |
Eleventh |
Under Process
|
Yes
|
85.00 |
Shailendra Kumar Sharma |
|
74
|
B2-1106-B6 |
Eleventh |
Under Process
|
Yes
|
85.00 |
Ajay Kumar Burnwal and Preeti Kumari |
|
75
|
B3-1107-B7 |
Eleventh |
Under Process
|
No
|
99.00 |
Deepak Kumar |
|
76
|
B3-1108-B8 |
Eleventh |
Under Process
|
Yes
|
99.00 |
Krishna Deo Singh and Meena Singh |
|
77
|
B3-1109-B9 |
Eleventh |
Under Process
|
Yes
|
99.00 |
Nitish Chandra and Rachna Thakur |
|
78
|
B4-1110-B10 |
Eleventh |
Under Process
|
Yes
|
89.00 |
Manish Kumar and Suman Verma |
|
79
|
B4-1111-B11 |
Eleventh |
Under Process
|
Yes
|
89.00 |
Sunil Kumar Choudhary |
|
80
|
B4-1112-B12 |
Eleventh |
Under Process
|
No
|
61.00 |
Kuldeep Kumar |
|
81
|
B4-1113-B15 |
Eleventh |
Under Process
|
Yes
|
89.00 |
Mrinal Rathaur |
|
82
|
B4-1114-B14 |
Eleventh |
Under Process
|
No
|
99.00 |
Nayendra Kumar |
|
83
|
B4-1115-B13 |
Eleventh |
Under Process
|
No
|
61.00 |
Subhash Devi |
|
84
|
B1-1201-B2 |
Twelfth |
Under Process
|
Yes
|
99.00 |
Prasoon Priyadarshi |
|
85
|
B1-1202-B1 |
Twelfth |
Under Process
|
Yes
|
99.00 |
Balram Bhagat |
|
86
|
B1-1203-B3 |
Twelfth |
Under Process
|
No
|
89.00 |
Karamchand Kumar |
|
87
|
B2-1204-B4 |
Twelfth |
Under Process
|
Yes
|
85.00 |
Sanjay Kumar |
|
88
|
B2-1205-B5 |
Twelfth |
Under Process
|
Yes
|
85.00 |
Manish Kumar Prasad |
|
89
|
B2-1206-B6 |
Twelfth |
Under Process
|
Yes
|
85.00 |
Jayshree Mohanta and Saurav Dutta |
|
90
|
B3-1207-B7 |
Twelfth |
Under Process
|
Yes
|
99.00 |
Reena S Kumar and Samrendra Kumar |
|
91
|
B3-1208-B8 |
Twelfth |
Under Process
|
Yes
|
99.00 |
Manoj Kumar and Ruby Kumari |
|
92
|
B3-1209-B9 |
Twelfth |
Under Process
|
No
|
99.00 |
Prabhat Kumar |
|
93
|
B4-1210-B10 |
Twelfth |
Under Process
|
Yes
|
89.00 |
Chittranjan Kumar |
|
94
|
B4-1211-B11 |
Twelfth |
Under Process
|
Yes
|
89.00 |
Reetika Singh |
|
95
|
B4-1212-B12 |
Twelfth |
Under Process
|
No
|
61.00 |
Naresh Kumar Ram |
|
96
|
B4-1213-B15 |
Twelfth |
Under Process
|
No
|
89.00 |
Rupchand Kumar |
|
97
|
B4-1214-B14 |
Twelfth |
Under Process
|
No
|
99.00 |
Nayendra Kumar |
|
98
|
B4-1215-B13 |
Twelfth |
Under Process
|
No
|
61.00 |
Naresh Kumar Ram |
|
99
|
B1-1301-B2 |
Thirteenth |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
100
|
B1-1302-B1 |
Thirteenth |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
101
|
B1-1303-B3 |
Thirteenth |
Under Process
|
Yes
|
89.00 |
Sandeep Kumar and Pinki Kumari |
|
102
|
B2-1304-B4 |
Thirteenth |
Under Process
|
No
|
85.00 |
Moti Infraheights Pvt Ltd |
|
103
|
B2-1305-B5 |
Thirteenth |
Under Process
|
No
|
85.00 |
Moti Infraheights Pvt Ltd |
|
104
|
B2-1306-B6 |
Thirteenth |
Under Process
|
No
|
85.00 |
Gautam Kumar and Pritam Kumar |
|
105
|
B3-1307-B7 |
Thirteenth |
Under Process
|
Yes
|
99.00 |
Sunit Kumar Roy and Shruti Roy |
|
106
|
B3-1308-B8 |
Thirteenth |
Under Process
|
Yes
|
99.00 |
Gunjan Chauhan |
|
107
|
B3-1309-B9 |
Thirteenth |
Under Process
|
No
|
99.00 |
Deepak Kumar |
|
108
|
B4-1310-B10 |
Thirteenth |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
109
|
B4-1311-B11 |
Thirteenth |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
110
|
B4-1312-B12 |
Thirteenth |
Under Process
|
No
|
61.00 |
Shivendra Kumar Yadav and others |
|
111
|
B4-1313-B15 |
Thirteenth |
Under Process
|
Yes
|
89.00 |
Pranav Kumar |
|
112
|
B4-1314-B14 |
Thirteenth |
Under Process
|
Yes
|
99.00 |
Nupur Chhawi and Kumar Amitabh |
|
113
|
A5-314-8 |
Third |
Under Process
|
Yes
|
107.00 |
Nitish Kumar and Anjali Prasad |
|
114
|
A5-315-6 |
Third |
Under Process
|
No
|
107.00 |
Raj Kumar and others |
|
115
|
A1-401-13 |
Fourth |
Under Process
|
Yes
|
189.00 |
Rohan Kaler |
|
116
|
A1-402-14 |
Fourth |
Under Process
|
Yes
|
169.00 |
Saket Kumar Singh and Richa Singh |
|
117
|
A1-403-15 |
Fourth |
Under Process
|
No
|
125.00 |
Shiv Shankar Sahu |
|
118
|
A2-404-12 |
Fourth |
Under Process
|
Yes
|
107.00 |
Saurabh Shresth |
|
119
|
A2-405-5 |
Fourth |
Under Process
|
No
|
107.00 |
Niraj Kumar |
|
120
|
A2-406-4 |
Fourth |
Under Process
|
No
|
107.00 |
Niraj Kumar |
|
121
|
A3-407-3 |
Fourth |
Under Process
|
No
|
107.00 |
Shyam Kishore Ram |
|
122
|
A3-408-2 |
Fourth |
Under Process
|
Yes
|
169.00 |
Prabhat Kumar Sinha and Jyoti Anand |
|
123
|
A3-409-1 |
Fourth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
124
|
A4-410-9 |
Fourth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
125
|
A4-411-11 |
Fourth |
Under Process
|
Yes
|
124.00 |
Himanshu Kumar |
|
126
|
A4-412-10 |
Fourth |
Under Process
|
Yes
|
107.00 |
Gayatri Sharma and Nand Kishor Sharma |
|
127
|
A5-413-7 |
Fourth |
Under Process
|
No
|
185.00 |
Satyanarayan Sahu |
|
128
|
A5-414-8 |
Fourth |
Under Process
|
Yes
|
107.00 |
Sanjay Kumar and Munni Burnwal |
|
129
|
A5-415-6 |
Fourth |
Under Process
|
No
|
107.00 |
Karamchand Kumar |
|
130
|
A1-501-13 |
Fifth |
Under Process
|
Yes
|
189.00 |
Seema Singh |
|
131
|
A1-502-14 |
Fifth |
Under Process
|
Yes
|
169.00 |
Arshe Alam |
|
132
|
A1-503-15 |
Fifth |
Under Process
|
No
|
125.00 |
Shiv Shankar Sahu |
|
133
|
A2-504-12 |
Fifth |
Under Process
|
Yes
|
107.00 |
Abhilasha |
|
134
|
A2-505-5 |
Fifth |
Under Process
|
No
|
107.00 |
Niraj Kumar |
|
135
|
A2-506-4 |
Fifth |
Under Process
|
No
|
107.00 |
Niraj Kumar |
|
136
|
A3-507-3 |
Fifth |
Under Process
|
Yes
|
107.00 |
Jayant Kumar |
|
137
|
A3-508-2 |
Fifth |
Under Process
|
Yes
|
169.00 |
Ajit Shanker and Kavita Shanker |
|
138
|
A3-509-1 |
Fifth |
Under Process
|
Yes
|
169.00 |
Rupam Ranjan |
|
139
|
A4-510-9 |
Fifth |
Under Process
|
Yes
|
107.00 |
Archana Kumari |
|
140
|
A4-511-11 |
Fifth |
Under Process
|
Yes
|
124.00 |
Anupama Mishra and Pawan Kumar Mishra |
|
141
|
B4-1315-B13 |
Thirteenth |
Under Process
|
No
|
61.00 |
Piyush Prasad |
|
142
|
Tower - C - C001-GA |
Ground |
Under Process
|
Yes
|
169.00 |
Satyanand Pandey and Suman Pandey |
|
143
|
C002-GC |
Ground |
Under Process
|
No
|
168.00 |
Moti Infraheights Pvt Ltd |
|
144
|
C-101-A |
First |
Under Process
|
Yes
|
169.00 |
Neelima Pandey |
|
145
|
C-102-C |
First |
Under Process
|
No
|
168.00 |
Moti Infraheights Pvt Ltd |
|
146
|
C-103-B |
First |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
147
|
A4-512-10 |
Fifth |
Under Process
|
Yes
|
107.00 |
Atul Anand and Usha Devi |
|
148
|
A5-513-7 |
Fifth |
Under Process
|
No
|
185.00 |
Baidyanath Sahu |
|
149
|
A5-514-8 |
Fifth |
Under Process
|
Yes
|
107.00 |
Neha Singh |
|
150
|
A5-515-6 |
Fifth |
Under Process
|
Yes
|
107.00 |
Anil Kumar Gupta |
|
151
|
A1-601-13 |
Sixth |
Under Process
|
No
|
189.00 |
Moti Infraheights Pvt Ltd |
|
152
|
A1-602-14 |
Sixth |
Under Process
|
Yes
|
169.00 |
Rabindra Prasad Singh |
|
153
|
A1-603-15 |
Sixth |
Under Process
|
Yes
|
125.00 |
Shashi and Pradeep Kumar Singh |
|
154
|
C-201-A |
Second |
Under Process
|
Yes
|
169.00 |
Suvis Alloys Trading LLP |
|
155
|
C-202-C |
Second |
Under Process
|
Yes
|
168.00 |
Rajesh Verma |
|
156
|
C-203-B |
Second |
Under Process
|
Yes
|
168.00 |
Shashank Verma and Shrini Sugandha |
|
157
|
C-301-A |
Third |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
158
|
C-302-C |
Third |
Under Process
|
Yes
|
168.00 |
Praveen Kumar Sinha |
|
159
|
C-303-B |
Third |
Under Process
|
Yes
|
168.00 |
Ilashree Kumar |
|
160
|
C-401-A |
Fourth |
Under Process
|
Yes
|
169.00 |
Mamta Rani |
|
161
|
C-402-C |
Fourth |
Under Process
|
Yes
|
168.00 |
Ravi Ranjan Sinha Gaurav Kumar and Saurav Kumar |
|
162
|
C-403-B |
Fourth |
Under Process
|
Yes
|
169.00 |
Kiran Kumari |
|
163
|
C-501-A |
Fifth |
Under Process
|
Yes
|
169.00 |
Roshni Gupta |
|
164
|
C-502-C |
Fifth |
Under Process
|
No
|
168.00 |
Moti Infraheights Pvt Ltd |
|
165
|
C-503-B |
Fifth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
166
|
C-601-A |
Sixth |
Under Process
|
Yes
|
169.00 |
Aradhana Kumari |
|
167
|
C-602-C |
Sixth |
Under Process
|
No
|
168.00 |
Shrish Kumar |
|
168
|
A2-604-12 |
Sixth |
Under Process
|
Yes
|
107.00 |
Chandan Bharati |
|
169
|
A2-605-5 |
Sixth |
Under Process
|
Yes
|
107.00 |
Shilpi Mishra |
|
170
|
A2-606-4 |
Sixth |
Under Process
|
No
|
107.00 |
Shyam Kishore Ram |
|
171
|
A3-607-3 |
Sixth |
Under Process
|
No
|
107.00 |
Dharamchand Kumar |
|
172
|
A3-608-2 |
Sixth |
Under Process
|
Yes
|
169.00 |
Priya Ojha |
|
173
|
A3-609-1 |
Sixth |
Under Process
|
No
|
169.00 |
Manu Ram Kashyap |
|
174
|
A4-610-9 |
Sixth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
175
|
A4-611-11 |
Sixth |
Under Process
|
No
|
124.00 |
Rupchand Kumar |
|
176
|
A4-612-10 |
Sixth |
Under Process
|
No
|
107.00 |
Rupchand Kumar |
|
177
|
A5-613-7 |
Sixth |
Under Process
|
No
|
185.00 |
Moti Infraheights Pvt Ltd |
|
178
|
A5-614-8 |
Sixth |
Under Process
|
No
|
107.00 |
Sikandar Ram |
|
179
|
A5-615-6 |
Sixth |
Under Process
|
No
|
107.00 |
Vijay Kumar Sahu |
|
180
|
A1-701-13 |
Seventh |
Under Process
|
No
|
189.00 |
Moti Infraheights Pvt Ltd |
|
181
|
A1-702-14 |
Seventh |
Under Process
|
Yes
|
169.00 |
Khushbu Agrawal |
|
182
|
A1-703-15 |
Seventh |
Under Process
|
Yes
|
125.00 |
Anuj Kumar and Jawahar Lal Agrawal |
|
183
|
A2-704-12 |
Seventh |
Under Process
|
Yes
|
107.00 |
Sanjay Kumar and Rani Kumari |
|
184
|
A2-705-5 |
Seventh |
Under Process
|
No
|
107.00 |
Sushmita Kumari |
|
185
|
A2-706-4 |
Seventh |
Under Process
|
Yes
|
107.00 |
Prasad Abhishek Anand |
|
186
|
A3-707-3 |
Seventh |
Under Process
|
Yes
|
107.00 |
Harshita Mandal and Manohar Prasad |
|
187
|
A3-708-2 |
Seventh |
Under Process
|
Yes
|
169.00 |
Nikhil Gaurav |
|
188
|
A3-709-1 |
Seventh |
Under Process
|
No
|
169.00 |
Manu Ram Kashyap |
|
189
|
A4-710-9 |
Seventh |
Under Process
|
No
|
107.00 |
Chandan Kumar |
|
190
|
A4-711-11 |
Seventh |
Under Process
|
Yes
|
124.00 |
Pankaj Kumar Raj |
|
191
|
A4-712-10 |
Seventh |
Under Process
|
Yes
|
107.00 |
Manashwee Verma |
|
192
|
A5-713-7 |
Seventh |
Under Process
|
No
|
185.00 |
Baidyanath Sahu |
|
193
|
A5-714-8 |
Seventh |
Under Process
|
No
|
107.00 |
Ravi Kumar |
|
194
|
A5-715-6 |
Seventh |
Under Process
|
Yes
|
107.00 |
Sushma Barnwal |
|
195
|
A1-801-13 |
Eighth |
Under Process
|
Yes
|
189.00 |
Smita and Binay Kumar |
|
196
|
A1-802-14 |
Eighth |
Under Process
|
Yes
|
169.00 |
Chanda Kumari |
|
197
|
A1-803-15 |
Eighth |
Under Process
|
No
|
125.00 |
Gautam Kumar and Pritam Kumar |
|
198
|
A2-804-12 |
Eighth |
Under Process
|
Yes
|
107.00 |
Kumar Nitin |
|
199
|
A2-805-5 |
Eighth |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
200
|
A2-806-4 |
Eighth |
Under Process
|
No
|
107.00 |
Arun Kumar Sahu |
|
201
|
A3-807-3 |
Eighth |
Under Process
|
Yes
|
107.00 |
Avinash Suman |
|
202
|
A3-809-1 |
Eighth |
Under Process
|
Yes
|
169.00 |
Sikandar Punam and Shashank Kumar |
|
203
|
A4-810-9 |
Eighth |
Under Process
|
No
|
107.00 |
Chandan Kumar |
|
204
|
A4-811-11 |
Eighth |
Under Process
|
Yes
|
124.00 |
Amrita and Prashant Singh |
|
205
|
A4-812-10 |
Eighth |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
206
|
A5-813-7 |
Eighth |
Under Process
|
Yes
|
185.00 |
Sanjay Kumar Singh and Vina Kumari Singh |
|
207
|
A5-814-8 |
Eighth |
Under Process
|
Yes
|
107.00 |
Jayant Kumar and Preety Sahay |
|
208
|
A5-815-6 |
Eighth |
Under Process
|
Yes
|
107.00 |
Pradip Kumar Gupta |
|
209
|
A1-901-13 |
Ninth |
Under Process
|
Yes
|
189.00 |
Shobha Rani |
|
210
|
A1-902-14 |
Ninth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
211
|
A1-903-15 |
Ninth |
Under Process
|
No
|
125.00 |
Ravi Kumar |
|
212
|
A2-904-12 |
Ninth |
Under Process
|
Yes
|
107.00 |
Alpana Kumari Sinha and Dhirendra Kumar Sahi |
|
213
|
A2-905-5 |
Ninth |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
214
|
A2-906-4 |
Ninth |
Under Process
|
No
|
107.00 |
Pankaj Kumar Sahu |
|
215
|
A3-907-3 |
Ninth |
Under Process
|
Yes
|
107.00 |
Rajesh Kumar and Kavita Kumar |
|
216
|
A3-908-2 |
Ninth |
Under Process
|
Yes
|
169.00 |
Madan Mohan Jaiswal and Shreya Mohan |
|
217
|
A3-909-1 |
Ninth |
Under Process
|
Yes
|
169.00 |
Arvind Kumar |
|
218
|
A4-910-9 |
Ninth |
Under Process
|
No
|
107.00 |
Ranjan Kumar |
|
219
|
A4-911-11 |
Ninth |
Under Process
|
No
|
124.00 |
Moti Infraheights Pvt Ltd |
|
220
|
A4-912-10 |
Ninth |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
221
|
A5-913-7 |
Ninth |
Under Process
|
Yes
|
185.00 |
Rashmi Rani |
|
222
|
A5-914-8 |
Ninth |
Under Process
|
No
|
107.00 |
Adhir Kumar |
|
223
|
A5-915-6 |
Ninth |
Under Process
|
No
|
107.00 |
Rupchand Kumar |
|
224
|
A1-1001-13 |
Tenth |
Under Process
|
Yes
|
189.00 |
Santosh Kumar Sahu and Sunita Sahu |
|
225
|
A1-1002-14 |
Tenth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
226
|
A1-1003-15 |
Tenth |
Under Process
|
No
|
125.00 |
Chetan Kumar |
|
227
|
A2-1004-12 |
Tenth |
Under Process
|
No
|
107.00 |
Mamta Kumari |
|
228
|
A2-1005-5 |
Tenth |
Under Process
|
No
|
107.00 |
Mamta Kumari |
|
229
|
A2-1006-4 |
Tenth |
Under Process
|
No
|
107.00 |
Mamta Kumari |
|
230
|
A3-1007-3 |
Tenth |
Under Process
|
Yes
|
107.00 |
Archana Sinha and Uday Kumar Sinha |
|
231
|
A3-1008-2 |
Tenth |
Under Process
|
No
|
169.00 |
Chetan Kumar |
|
232
|
A3-1009-1 |
Tenth |
Under Process
|
No
|
169.00 |
Ajay Kumar |
|
233
|
A4-1010-9 |
Tenth |
Under Process
|
No
|
107.00 |
Ranjan Kumar |
|
234
|
A4-1011-11 |
Tenth |
Under Process
|
Yes
|
124.00 |
Amit Kumar Jaiswal and Sneha Jaiswal |
|
235
|
A4-1012-10 |
Tenth |
Under Process
|
Yes
|
107.00 |
Nandita Pandey and Ashok Bhaskar Pandey |
|
236
|
A5-1013-7 |
Tenth |
Under Process
|
No
|
185.00 |
Moti Infraheights Pvt Ltd |
|
237
|
A5-1014-8 |
Tenth |
Under Process
|
No
|
107.00 |
Chetan Kumar |
|
238
|
A5-1015-6 |
Tenth |
Under Process
|
Yes
|
107.00 |
Pawan Mishra |
|
239
|
A1-1101-13 |
Eleventh |
Under Process
|
No
|
189.00 |
Amit Kumar |
|
240
|
A1-1102-14 |
Eleventh |
Under Process
|
Yes
|
169.00 |
Bandana Kumari |
|
241
|
A1-1103-15 |
Eleventh |
Under Process
|
Yes
|
125.00 |
Vivek Kumar |
|
242
|
A2-1104-12 |
Eleventh |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
243
|
A2-1105-5 |
Eleventh |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
244
|
A2-1106-4 |
Eleventh |
Under Process
|
No
|
107.00 |
Gopi Sahu |
|
245
|
A3-1107-3 |
Eleventh |
Under Process
|
Yes
|
107.00 |
Jai Kishan Sahu |
|
246
|
A3-1108-2 |
Eleventh |
Under Process
|
Yes
|
169.00 |
Sonam Barnwal |
|
247
|
A3-1109-1 |
Eleventh |
Under Process
|
Yes
|
169.00 |
Chandan Kumar and Shipra Shekhar |
|
248
|
A4-1110-9 |
Eleventh |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
249
|
A4-1111-11 |
Eleventh |
Under Process
|
Yes
|
124.00 |
Divyank Raj |
|
250
|
A4-1112-10 |
Eleventh |
Under Process
|
No
|
107.00 |
Nayendra Kumar |
|
251
|
A5-1113-7 |
Eleventh |
Under Process
|
Yes
|
185.00 |
Nishi Kumari |
|
252
|
A5-1114-8 |
Eleventh |
Under Process
|
Yes
|
107.00 |
Abhishek Kumar |
|
253
|
A5-1115-6 |
Eleventh |
Under Process
|
No
|
107.00 |
Chandan Kumar |
|
254
|
A1-1201-13 |
Twelfth |
Under Process
|
Yes
|
189.00 |
Shobha Rani |
|
255
|
A1-1202-14 |
Twelfth |
Under Process
|
No
|
169.00 |
Lalchand Sahu |
|
256
|
A1-1203-15 |
Twelfth |
Under Process
|
Yes
|
125.00 |
Vedant Shikhar |
|
257
|
A2-1204-12 |
Twelfth |
Under Process
|
No
|
107.00 |
Shivratan Sahu |
|
258
|
A2-1205-5 |
Twelfth |
Under Process
|
Yes
|
107.00 |
Manoj Kumar and Arpana |
|
259
|
A2-1206-4 |
Twelfth |
Under Process
|
Yes
|
107.00 |
Satyendra Prasad |
|
260
|
A3-1207-3 |
Twelfth |
Under Process
|
Yes
|
107.00 |
Pankaj Kumar and Poonam |
|
261
|
A3-1208-2 |
Twelfth |
Under Process
|
Yes
|
169.00 |
Devinder Lok LLP |
|
262
|
A3-1209-1 |
Twelfth |
Under Process
|
Yes
|
169.00 |
Amlawati Tiwari |
|
263
|
A4-1210-9 |
Twelfth |
Under Process
|
Yes
|
107.00 |
Shiv Kumar Niraj |
|
264
|
A4-1211-11 |
Twelfth |
Under Process
|
Yes
|
124.00 |
Vikas Sinha and Ekta Sinha |
|
265
|
A4-1212-10 |
Twelfth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
266
|
A5-015-G6 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
267
|
C-603-B |
Sixth |
Under Process
|
No
|
169.00 |
Chandrashekhar Kumar |
|
268
|
C-701-A |
Seventh |
Under Process
|
No
|
169.00 |
Naresh Kumar Ram |
|
269
|
C-702-C |
Seventh |
Under Process
|
No
|
168.00 |
Naresh Kumar Ram |
|
270
|
C-703-B |
Seventh |
Under Process
|
No
|
169.00 |
Naresh Kumar Ram |
|
271
|
C-801-A |
Eighth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
272
|
C-802-C |
Eighth |
Under Process
|
No
|
168.00 |
Rupchand Kumar |
|
273
|
C-803-B |
Eighth |
Under Process
|
No
|
169.00 |
Ravi Kumar |
|
274
|
C-901-A |
Ninth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
275
|
C-902-C |
Ninth |
Under Process
|
Yes
|
168.00 |
Maun Prakash |
|
276
|
C-903-B |
Ninth |
Under Process
|
No
|
169.00 |
Sarla Devi |
|
277
|
C-1001-A |
Tenth |
Under Process
|
Yes
|
169.00 |
Dr Anshu Singh |
|
278
|
C-1002-C |
Tenth |
Under Process
|
No
|
168.00 |
Arvind Kumar |
|
279
|
C-1003-B |
Tenth |
Under Process
|
Yes
|
168.00 |
Urmila Choudhary and Rahul Kumar |
|
280
|
C-1101-A |
Eleventh |
Under Process
|
Yes
|
169.00 |
Rajeev Kumar and Archana Prasad |
|
281
|
C-1102-C |
Eleventh |
Under Process
|
Yes
|
168.00 |
Tiwisha Roy and mahesh Kumar Roy |
|
282
|
C-1103-B |
Eleventh |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
283
|
C-1201-A |
Twelfth |
Under Process
|
No
|
169.00 |
Chandan Kumar |
|
284
|
C-1202-C |
Twelfth |
Under Process
|
No
|
168.00 |
Chandan Kumar |
|
285
|
C-1203-B |
Twelfth |
Under Process
|
No
|
169.00 |
Chandan Kumar |
|
286
|
C-1301-A |
Thirteenth |
Under Process
|
No
|
169.00 |
Ranjan Kumar |
|
287
|
C-1302-C |
Thirteenth |
Under Process
|
No
|
168.00 |
Ranjan Kumar |
|
288
|
C-1303-B |
Thirteenth |
Under Process
|
No
|
169.00 |
Ranjan Kumar |
|
289
|
Tower - D - D1-001-11 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
290
|
D1-002-8 |
Ground |
Under Process
|
No
|
89.00 |
Birendra Sahu |
|
291
|
D1-003-9 |
Ground |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
292
|
D1-004-10 |
Ground |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
293
|
D2-005-7 |
Ground |
Under Process
|
No
|
89.00 |
Manu Ram Kashyap |
|
294
|
D2-006-F |
Ground |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
295
|
D2-007-G |
Ground |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
296
|
D2-008-4 |
Ground |
Under Process
|
No
|
89.00 |
Krishna Kumar |
|
297
|
D3-009-3 |
Ground |
Under Process
|
No
|
89.00 |
Shiv Shankar Sahu |
|
298
|
D3-010-2 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
299
|
D3-011-1 |
Ground |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
300
|
D1-101-K |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
301
|
D1-102-H |
First |
Under Process
|
No
|
89.00 |
Sahelini Devi |
|
302
|
D1-103-I |
First |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
303
|
D1-104-J |
First |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
304
|
D2-105-2G |
First |
Under Process
|
No
|
89.00 |
Sahelini Devi |
|
305
|
D2-106-1F |
First |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
306
|
D2-107-1G |
First |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
307
|
D2-108-D |
First |
Under Process
|
No
|
89.00 |
Nanku Sahu |
|
308
|
D3-109-C |
First |
Under Process
|
No
|
89.00 |
Satya Narayan Kumar |
|
309
|
D3-110-B |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
310
|
D3-111-A |
First |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
311
|
D1-201-K |
Second |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
312
|
D1-202-H |
Second |
Under Process
|
No
|
89.00 |
Arvind Kishore Ram |
|
313
|
D1-203-I |
Second |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
314
|
D1-204-J |
Second |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
315
|
D2-205-2G |
Second |
Under Process
|
No
|
89.00 |
Asha Devi |
|
316
|
D2-206-1F |
Second |
Under Process
|
No
|
108.00 |
Asha Devi |
|
317
|
D2-207-1G |
Second |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
318
|
D2-208-D |
Second |
Under Process
|
No
|
89.00 |
Purushottam Sahu |
|
319
|
D3-209-C |
Second |
Under Process
|
No
|
89.00 |
Satya Narayan Kumar |
|
320
|
D3-210-B |
Second |
Under Process
|
No
|
107.00 |
Deepak Kumar |
|
321
|
D3-211-A |
Second |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
322
|
D1-301-K |
Third |
Under Process
|
No
|
107.00 |
Deepak Kumar |
|
323
|
D1-302-H |
Third |
Under Process
|
No
|
89.00 |
Manu Ram Kashyap |
|
324
|
D1-303-I |
Third |
Under Process
|
Yes
|
108.00 |
Sewanti Sharma |
|
325
|
D1-304-J |
Third |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
326
|
D2-305-2G |
Third |
Under Process
|
No
|
89.00 |
Manu Ram Kashyap |
|
327
|
D2-306-1F |
Third |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
328
|
D2-307-1G |
Third |
Under Process
|
Yes
|
108.00 |
Dipti Priya Mishra |
|
329
|
D2-308-D |
Third |
Under Process
|
No
|
89.00 |
Chandrashekhar Kumar |
|
330
|
A5-1213-7 |
Twelfth |
Under Process
|
No
|
185.00 |
Moti Infraheights Pvt Ltd |
|
331
|
A5-1214-8 |
Twelfth |
Under Process
|
Yes
|
107.00 |
Anup bank and Swati Banka |
|
332
|
A5-1215-6 |
Twelfth |
Under Process
|
Yes
|
107.00 |
Ravitesh Shankar |
|
333
|
A1-1301-13 |
Thirteenth |
Under Process
|
No
|
189.00 |
Deepak Kumar |
|
334
|
A1-1302-14 |
Thirteenth |
Under Process
|
No
|
169.00 |
Moti Infraheights Pvt Ltd |
|
335
|
A1-1303-15 |
Thirteenth |
Under Process
|
No
|
125.00 |
Moti Infraheights Pvt Ltd |
|
336
|
A2-1304-12 |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
337
|
A2-1305-5 |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
338
|
A2-1306-4 |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
339
|
A3-1307-3 |
Thirteenth |
Under Process
|
Yes
|
107.00 |
Pankaj Kumar and Poonam |
|
340
|
A3-1308-2 |
Thirteenth |
Under Process
|
Yes
|
169.00 |
Devinder Lok LLP |
|
341
|
A3-1309-1 |
Thirteenth |
Under Process
|
Yes
|
169.00 |
Sanjay Singh and Manisha Pallavi Chouhan |
|
342
|
A4-1310-9 |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
343
|
A4-1311-11 |
Thirteenth |
Under Process
|
No
|
124.00 |
Ranjan Kumar |
|
344
|
A4-1312-10 |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
345
|
A5-1313-7 |
Thirteenth |
Under Process
|
No
|
185.00 |
Moti Infraheights Pvt Ltd |
|
346
|
A5-1314-8 |
Thirteenth |
Under Process
|
Yes
|
107.00 |
Anup Banka and Swati Banka |
|
347
|
A5-1315-6 |
Thirteenth |
Under Process
|
Yes
|
107.00 |
Kamla Kant Sahu |
|
348
|
Tower - B - B1-001-GB2 |
Ground |
Under Process
|
No
|
99.00 |
Krishna Kumar |
|
349
|
B1-002-GB1 |
Ground |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
350
|
B1-003-GB3 |
Ground |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
351
|
B2-004-GB4 |
Ground |
Under Process
|
No
|
85.00 |
Ramchandra Sahu |
|
352
|
B2-005-GB5 |
Ground |
Under Process
|
No
|
85.00 |
Sakendra Sahu |
|
353
|
B2-006-GB6 |
Ground |
Under Process
|
Yes
|
85.00 |
Sarita Kumari |
|
354
|
B3-007-GB7 |
Ground |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
355
|
B3-008-GB8 |
Ground |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
356
|
B3-009-GB9 |
Ground |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
357
|
B4-010-GB10 |
Ground |
Under Process
|
No
|
89.00 |
Sahelini Devi |
|
358
|
B4-011-GB11 |
Ground |
Under Process
|
Yes
|
89.00 |
Amit Kumar and Shilpi Gupta |
|
359
|
B4-012-GB12 |
Ground |
Under Process
|
No
|
61.00 |
Rita Devi |
|
360
|
B4-015-GB15 |
Ground |
Under Process
|
No
|
89.00 |
Piyush Prasad |
|
361
|
B4-014-GB14 |
Ground |
Under Process
|
Yes
|
99.00 |
Jaydrath Prasad and Suchita Prasad |
|
362
|
B4-013-GB13 |
Ground |
Under Process
|
Yes
|
61.00 |
Jaydrath Prasad and Suchitra Prasad |
|
363
|
B1-101-B2 |
First |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
364
|
B1-102-B1 |
First |
Under Process
|
Yes
|
99.00 |
Manish Kumar Sharma |
|
365
|
D3-309-C |
Third |
Under Process
|
No
|
89.00 |
Ajay Kumar |
|
366
|
D3-310-B |
Third |
Under Process
|
No
|
107.00 |
Ajay Kumar |
|
367
|
D3-311-A |
Third |
Under Process
|
No
|
107.00 |
Ajay Kumar |
|
368
|
D1-401-K |
Fourth |
Under Process
|
Yes
|
107.00 |
Dhananjay Kumar Prajapati |
|
369
|
D1-402-H |
Fourth |
Under Process
|
Yes
|
89.00 |
Subodh Kumar Singh |
|
370
|
D1-403-I |
Fourth |
Under Process
|
Yes
|
108.00 |
Dinkar Antlin |
|
371
|
D1-404-J |
Fourth |
Under Process
|
Yes
|
108.00 |
Rashmi Gupta and Animesh Kumar |
|
372
|
B1-103-B3 |
First |
Under Process
|
Yes
|
89.00 |
Anshu Tiwary |
|
373
|
B2-104-B4 |
First |
Under Process
|
No
|
85.00 |
Ramchandra Sahu |
|
374
|
B2-105-B5 |
First |
Under Process
|
No
|
85.00 |
Ramchandra Sahu |
|
375
|
B2-106-B6 |
First |
Under Process
|
No
|
85.00 |
Ramchandra Sahu |
|
376
|
B3-107-B7 |
First |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
377
|
B3-108-B8 |
First |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
378
|
B3-109-B9 |
First |
Under Process
|
Yes
|
99.00 |
Shivani and Niraj Kumar Mishra |
|
379
|
B4-110-B10 |
First |
Under Process
|
Yes
|
89.00 |
Rajesh Kumar Singh |
|
380
|
B4-111-B11 |
First |
Under Process
|
No
|
89.00 |
Sakendra Sahu |
|
381
|
B4-112-B12 |
First |
Under Process
|
No
|
61.00 |
Rita Devi |
|
382
|
B4-113-B15 |
First |
Under Process
|
No
|
89.00 |
Shiv Shankar Sahu |
|
383
|
B4-114-B14 |
First |
Under Process
|
Yes
|
99.00 |
Arun Kumar and Kumari Sweta |
|
384
|
B4-115-B13 |
First |
Under Process
|
No
|
61.00 |
Rita Devi |
|
385
|
B1-201-B2 |
Second |
Under Process
|
Yes
|
99.00 |
Vijay Kumar and Alpana Singh |
|
386
|
D2-405-2G |
Fourth |
Under Process
|
Yes
|
89.00 |
Rita Kumari |
|
387
|
D2-406-1F |
Fourth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
388
|
D2-407-1G |
Fourth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
389
|
D2-408-D |
Fourth |
Under Process
|
Yes
|
89.00 |
Summi Dutta and Saket Chandra |
|
390
|
D3-409-C |
Fourth |
Under Process
|
No
|
89.00 |
Anita Kumari |
|
391
|
D3-410-B |
Fourth |
Under Process
|
Yes
|
107.00 |
Anil Kumar Singh and Anjali Singh |
|
392
|
D3-411-A |
Fourth |
Under Process
|
Yes
|
107.00 |
Amrendra Kumar Singh |
|
393
|
B1-202-B1 |
Second |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
394
|
B1-203-B3 |
Second |
Under Process
|
No
|
89.00 |
Dharamchand Kumar |
|
395
|
B2-204-B4 |
Second |
Under Process
|
No
|
85.00 |
Sakendra Sahu |
|
396
|
B2-105-B5 |
Second |
Under Process
|
No
|
85.00 |
Sakendra Sahu |
|
397
|
B2-206-B6 |
Second |
Under Process
|
No
|
85.00 |
Sakendra Sahu |
|
398
|
B3-207-B7 |
Second |
Under Process
|
No
|
99.00 |
Moti Infraheights Pvt Ltd |
|
399
|
B3-208-B8 |
Second |
Under Process
|
Yes
|
99.00 |
Deepa Kumari |
|
400
|
B3-209-B9 |
Second |
Under Process
|
Yes
|
99.00 |
Rakesh Chandra |
|
401
|
B4-210-B10 |
Second |
Under Process
|
Yes
|
89.00 |
Raju Kumar and Ruby Singh |
|
402
|
B4-211-B11 |
Second |
Under Process
|
No
|
89.00 |
Ramchandra Sahu |
|
403
|
B4-212-B12 |
Second |
Under Process
|
No
|
61.00 |
Surendra Sahu |
|
404
|
B4-213-B15 |
Second |
Under Process
|
No
|
89.00 |
Giri Kishore Kumar |
|
405
|
B4-214-B14 |
Second |
Under Process
|
No
|
99.00 |
Giri Kishore Kumar |
|
406
|
B4-215-B13 |
Second |
Under Process
|
No
|
61.00 |
Rita Devi |
|
407
|
B1-301-B2 |
Third |
Under Process
|
Yes
|
99.00 |
Deepak Kumar |
|
408
|
B1-302-B1 |
Third |
Under Process
|
Yes
|
99.00 |
Vinay Kumar |
|
409
|
B1-303-B3 |
Third |
Under Process
|
No
|
89.00 |
Dharamchand Kumar |
|
410
|
B2-304-B4 |
Third |
Under Process
|
No
|
85.00 |
Piyush Prasad |
|
411
|
B2-305-B5 |
Third |
Under Process
|
No
|
85.00 |
Piyush Prasad |
|
412
|
B2-606-B6 |
Third |
Under Process
|
No
|
85.00 |
Piyush Prasad |
|
413
|
B3-307-B7 |
Third |
Under Process
|
No
|
99.00 |
Vijay Kumar Sahu |
|
414
|
B3-308-B8 |
Third |
Under Process
|
No
|
99.00 |
Moti Kumar Sahu |
|
415
|
B3-309-B9 |
Third |
Under Process
|
No
|
99.00 |
Vivek Kumar Ram |
|
416
|
B4-310-B10 |
Third |
Under Process
|
Yes
|
89.00 |
Ravi Kumar Nirala |
|
417
|
B4-311-B11 |
Third |
Under Process
|
Yes
|
89.00 |
Manish Kumar Mishra |
|
418
|
B4-312-B12 |
Third |
Under Process
|
No
|
61.00 |
Santosh Kumar |
|
419
|
B4-313-B15 |
Third |
Under Process
|
No
|
89.00 |
Ravi Kumar |
|
420
|
B4-314-B14 |
Third |
Under Process
|
Yes
|
99.00 |
Manoj Kumar and Sudha Barnwal |
|
421
|
B4-315-B13 |
Third |
Under Process
|
No
|
61.00 |
Shivendra Kumar Yadav and others |
|
422
|
B1-401-B2 |
Fourth |
Under Process
|
Yes
|
99.00 |
Arun Kumar Rai |
|
423
|
B1-402-B1 |
Fourth |
Under Process
|
Yes
|
99.00 |
Ashish Kumar Keshri |
|
424
|
B1-403-B3 |
Fourth |
Under Process
|
No
|
89.00 |
Karamchand Kumar |
|
425
|
B2-404-B4 |
Fourth |
Under Process
|
No
|
85.00 |
Moti Kumar Sahu |
|
426
|
B2-405-B5 |
Fourth |
Under Process
|
No
|
85.00 |
Piyush Prasad |
|
427
|
B2-406-B6 |
Fourth |
Under Process
|
No
|
85.00 |
Moti Kumar Sahu |
|
428
|
D1-501-K |
Fifth |
Under Process
|
Yes
|
107.00 |
Arshe Alam |
|
429
|
D1-502-H |
Fifth |
Under Process
|
Yes
|
89.00 |
Anuradha Kumari |
|
430
|
D1-503-I |
Fifth |
Under Process
|
No
|
108.00 |
Rupchand Kumar |
|
431
|
D1-504-J |
Fifth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
432
|
D2-505-2G |
Fifth |
Under Process
|
No
|
89.00 |
Naresh Kumar Ram |
|
433
|
D2-506-1F |
Fifth |
Under Process
|
No
|
108.00 |
Naresh Kumar Ram |
|
434
|
D2-507-1G |
Fifth |
Under Process
|
No
|
108.00 |
Naresh Kumar Ram |
|
435
|
B3-407-B7 |
Fourth |
Under Process
|
No
|
99.00 |
Sikandar Ram |
|
436
|
B3-408-B8 |
Fourth |
Under Process
|
No
|
99.00 |
Vivek Kumar Ram |
|
437
|
B3-409-B9 |
Fourth |
Under Process
|
Yes
|
99.00 |
Hemendra Kumar Bhagat |
|
438
|
B4-410-B10 |
Fourth |
Under Process
|
No
|
89.00 |
Aditya Kumar |
|
439
|
B4-411-B11 |
Fourth |
Under Process
|
Yes
|
89.00 |
Anuradha Kumari |
|
440
|
B4-412-B12 |
Fourth |
Under Process
|
No
|
61.00 |
Poonam Devi |
|
441
|
B4-413-B15 |
Fourth |
Under Process
|
No
|
89.00 |
Poonam Devi |
|
442
|
D2-508-D |
Fifth |
Under Process
|
Yes
|
89.00 |
Kumari Hansika and Pankaj Kumar Singh |
|
443
|
D3-509-C |
Fifth |
Under Process
|
No
|
89.00 |
Nilmani Devi |
|
444
|
D3-510-B |
Fifth |
Under Process
|
No
|
107.00 |
Karamchand Kumar |
|
445
|
D3-511-A |
Fifth |
Under Process
|
No
|
107.00 |
Dharamchand Kumar |
|
446
|
D1-601-K |
Sixth |
Under Process
|
No
|
107.00 |
Sikandar Ram |
|
447
|
D1-602-H |
Sixth |
Under Process
|
No
|
89.00 |
Sikandar Ram |
|
448
|
D1-603-I |
Sixth |
Under Process
|
No
|
108.00 |
Sikandar Ram |
|
449
|
B4-414-B14 |
Fourth |
Under Process
|
No
|
99.00 |
Poonam Devi |
|
450
|
B4-415-B13 |
Fourth |
Under Process
|
No
|
61.00 |
Naresh Kumar Ram |
|
451
|
B1-501-B2 |
Fifth |
Under Process
|
Yes
|
99.00 |
Jyoti Kumari Gupta and Suraj Kumar Sahu |
|
452
|
B1-502-B1 |
Fifth |
Under Process
|
Yes
|
99.00 |
Akhilesh Kumar and Bindu Singh |
|
453
|
B1-503-B3 |
Fifth |
Under Process
|
Yes
|
89.00 |
Amaresh Kumar Prasad and Akshita Shankar |
|
454
|
B2-504-B4 |
Fifth |
Under Process
|
No
|
85.00 |
Vijay Kumar Sahu |
|
455
|
B2-505-B5 |
Fifth |
Under Process
|
No
|
85.00 |
Vijay Kumar Sahu |
|
456
|
B2-506-B6 |
Fifth |
Under Process
|
No
|
85.00 |
Digambar Ohdar |
|
457
|
B3-507-B7 |
Fifth |
Under Process
|
Yes
|
99.00 |
Purushottam Jha |
|
458
|
B3-508-B8 |
Fifth |
Under Process
|
No
|
99.00 |
Moti Kumar Sahu |
|
459
|
B3-509-B9 |
Fifth |
Under Process
|
Yes
|
99.00 |
Nitesh Kumar and Anamika |
|
460
|
B4-510-B10 |
Fifth |
Under Process
|
No
|
89.00 |
Prashant and Simant |
|
461
|
B4-511-B11 |
Fifth |
Under Process
|
No
|
89.00 |
Prashant and Simant |
|
462
|
B4-512-B12 |
Fifth |
Under Process
|
Yes
|
61.00 |
Champa Prasad |
|
463
|
B4-513-B15 |
Fifth |
Under Process
|
Yes
|
89.00 |
Manoj Prajapati |
|
464
|
B4-514-B14 |
Fifth |
Under Process
|
No
|
99.00 |
Neelu Ram |
|
465
|
B4-515-B13 |
Fifth |
Under Process
|
Yes
|
61.00 |
Ajay Kumar and Neelam Sahu |
|
466
|
B1-601-B2 |
Sixth |
Under Process
|
Yes
|
99.00 |
Ravitesh Kumar and Vandana Verma |
|
467
|
B1-602-B1 |
Sixth |
Under Process
|
Yes
|
99.00 |
Neelendu Sharan |
|
468
|
B1-603-B3 |
Sixth |
Under Process
|
Yes
|
89.00 |
Bipin Prasad Keshri |
|
469
|
B2-604-B4 |
Sixth |
Under Process
|
No
|
85.00 |
Shivjatan Sahu |
|
470
|
B2-605-B5 |
Sixth |
Under Process
|
Yes
|
85.00 |
Brajesh Kumar |
|
471
|
B2-606-B6 |
Sixth |
Under Process
|
No
|
85.00 |
Shivjatan Sahu |
|
472
|
B3-607-B7 |
Sixth |
Under Process
|
No
|
99.00 |
Kuldeep Kumar |
|
473
|
B3-608-B8 |
Sixth |
Under Process
|
Yes
|
99.00 |
Upendra Kumar Sah and Beauti Kumari |
|
474
|
B3-609-B9 |
Sixth |
Under Process
|
Yes
|
99.00 |
Ajit Kumar and Sweta Kumari |
|
475
|
B4-610-B10 |
Sixth |
Under Process
|
No
|
89.00 |
Meena Devi |
|
476
|
B4-611-B11 |
Sixth |
Under Process
|
No
|
89.00 |
Meena Devi |
|
477
|
B4-612-B12 |
Sixth |
Under Process
|
No
|
61.00 |
Geeta Devi |
|
478
|
B4-613-B15 |
Sixth |
Under Process
|
No
|
89.00 |
Geeta Devi |
|
479
|
B4-614-B14 |
Sixth |
Under Process
|
No
|
99.00 |
Geeta Devi |
|
480
|
B4-615-B13 |
Sixth |
Under Process
|
No
|
61.00 |
Geeta Devi |
|
481
|
B1-701-B2 |
Seventh |
Under Process
|
Yes
|
99.00 |
Swati Terway and Saurrow Kumar |
|
482
|
B1-702-B1 |
Seventh |
Under Process
|
Yes
|
99.00 |
Akhilesh Kumar and Sangita Kumari |
|
483
|
B1-703-B3 |
Seventh |
Under Process
|
No
|
89.00 |
Gautam Kumar and Pritam Kumar |
|
484
|
D1-604-J |
Sixth |
Under Process
|
No
|
108.00 |
Sikandar Ram |
|
485
|
D2-605-2G |
Sixth |
Under Process
|
No
|
89.00 |
Kishwar Kumar and Shankar Kumar |
|
486
|
D2-606-1F |
Sixth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
487
|
D2-607-1G |
Sixth |
Under Process
|
Yes
|
108.00 |
Naveen Kumar and Sandhya Kumari |
|
488
|
D2-608-D |
Sixth |
Under Process
|
No
|
89.00 |
Kishwar Kumar and Shankar Kumar |
|
489
|
D3-609-C |
Sixth |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
490
|
D3-610-B |
Sixth |
Under Process
|
Yes
|
107.00 |
Sarvjeet Kumar |
|
491
|
D3-611-A |
Sixth |
Under Process
|
No
|
107.00 |
Sunita Devi |
|
492
|
D1-701-K |
Seventh |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
493
|
D1-702-H |
Seventh |
Under Process
|
No
|
89.00 |
Jitan Devi |
|
494
|
D1-703-I |
Seventh |
Under Process
|
Yes
|
108.00 |
Anju Kumari |
|
495
|
D1-704-J |
Seventh |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
496
|
D2-705-2G |
Seventh |
Under Process
|
Yes
|
89.00 |
Suman Kumari |
|
497
|
D2-706-1F |
Seventh |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
498
|
B2-704-B4 |
Seventh |
Under Process
|
Yes
|
85.00 |
Nutan Gupta |
|
499
|
B2-705-B5 |
Seventh |
Under Process
|
No
|
85.00 |
Satish Kumar and Madhu Rani |
|
500
|
B2-706-B6 |
Seventh |
Under Process
|
No
|
85.00 |
Gautam Kumar and Pritam Kumar |
|
501
|
D2-707-1G |
Seventh |
Under Process
|
Yes
|
108.00 |
Monika Raj and Prateek Raj |
|
502
|
D2-708-D |
Seventh |
Under Process
|
No
|
89.00 |
Giri Kishore Kumar |
|
503
|
D3-709-C |
Seventh |
Under Process
|
No
|
89.00 |
Sikandar Ram |
|
504
|
D3-710-B |
Seventh |
Under Process
|
Yes
|
107.00 |
Anita Devi |
|
505
|
D3-711-A |
Seventh |
Under Process
|
No
|
107.00 |
Sushmita Kumari |
|
506
|
D1-801-K |
Eighth |
Under Process
|
No
|
107.00 |
Sweta Kumari |
|
507
|
D1-802-H |
Eighth |
Under Process
|
Yes
|
89.00 |
Arbind Kumar Singh and Anita Devi |
|
508
|
D1-803-I |
Eighth |
Under Process
|
Yes
|
108.00 |
Arshe Alam |
|
509
|
D1-804-J |
Eighth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
510
|
D2-805-2G |
Eighth |
Under Process
|
Yes
|
89.00 |
Arijit Sarkar and Dipeeka Kumari |
|
511
|
D2-806-1F |
Eighth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
512
|
D2-807-1G |
Eighth |
Under Process
|
Yes
|
108.00 |
Sanjeev Kumar and Abhijeet Raj |
|
513
|
D2-808-D |
Eighth |
Under Process
|
Yes
|
89.00 |
S Abhishek Singh |
|
514
|
D3-809-C |
Eighth |
Under Process
|
No
|
89.00 |
Adhir Kumar |
|
515
|
D3-810-B |
Eighth |
Under Process
|
Yes
|
107.00 |
Sangeeta Kumari and Suchetan Sasis |
|
516
|
D3-811-A |
Eighth |
Under Process
|
No
|
107.00 |
Anita Kumari |
|
517
|
D1-901-K |
Ninth |
Under Process
|
Yes
|
107.00 |
Rajeev Kumar Singh |
|
518
|
D1-902-H |
Ninth |
Under Process
|
Yes
|
89.00 |
Swamit Mahuri and Rekha Mahuri |
|
519
|
D1-903-I |
Ninth |
Under Process
|
Yes
|
108.00 |
Dushyant Kumar Kashyap |
|
520
|
D1-904-J |
Ninth |
Under Process
|
Yes
|
108.00 |
Mantu Kumar Mandal |
|
521
|
D2-905-2G |
Ninth |
Under Process
|
Yes
|
89.00 |
Mukesh Kumar Barnwal and Nilam Kumari |
|
522
|
D2-906-1F |
Ninth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
523
|
D2-907-1G |
Ninth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
524
|
D2-908-D |
Ninth |
Under Process
|
No
|
89.00 |
Shiv Shankar Sahu |
|
525
|
D3-910-B |
Ninth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
526
|
D3-911-A |
Ninth |
Under Process
|
Yes
|
107.00 |
Rochit Kumar |
|
527
|
D1-1001-K |
Tenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
528
|
D1-1002-H |
Tenth |
Under Process
|
No
|
89.00 |
Maninath Sahu |
|
529
|
D1-1003-I |
Tenth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
530
|
D1-1004-J |
Tenth |
Under Process
|
Yes
|
108.00 |
Mayank Doshi |
|
531
|
D2-1005-2G |
Tenth |
Under Process
|
No
|
89.00 |
Chandan Kumar |
|
532
|
D2-1006-1F |
Tenth |
Under Process
|
No
|
108.00 |
Chandan Kumar |
|
533
|
D2-1007-1G |
Tenth |
Under Process
|
No
|
108.00 |
Chandan Kumar |
|
534
|
D2-1008-D |
Tenth |
Under Process
|
No
|
89.00 |
Chandan Kumar |
|
535
|
D3-1009-C |
Tenth |
Under Process
|
Yes
|
89.00 |
Rupak Kumar Verma and Annu Kumari |
|
536
|
D3-1010-B |
Tenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
537
|
D3-1011-A |
Tenth |
Under Process
|
Yes
|
107.00 |
Rupa Anand |
|
538
|
D1-1101-K |
Eleventh |
Under Process
|
Yes
|
107.00 |
Purushottam Kumar |
|
539
|
D1-1102-H |
Eleventh |
Under Process
|
No
|
89.00 |
Maninath Sahu |
|
540
|
D1-1103-I |
Eleventh |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
541
|
D1-1104-J |
Eleventh |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
542
|
D2-1105-2G |
Eleventh |
Under Process
|
No
|
89.00 |
Ranjan Kumar |
|
543
|
D2-1106-1F |
Eleventh |
Under Process
|
No
|
108.00 |
Ranjan Kumar |
|
544
|
D2-1107-1G |
Eleventh |
Under Process
|
No
|
108.00 |
Ranjan Kumar |
|
545
|
D2-1108-D |
Eleventh |
Under Process
|
Yes
|
89.00 |
Ankit Tekriwal and Karishma Jindal |
|
546
|
D3-1109-C |
Eleventh |
Under Process
|
Yes
|
89.00 |
Rahul Kumar and Dibya Kumari |
|
547
|
D3-1110-B |
Eleventh |
Under Process
|
Yes
|
107.00 |
Baleshwar Mahto |
|
548
|
D3-1111-A |
Eleventh |
Under Process
|
Yes
|
107.00 |
Apurva Sweta |
|
549
|
D1-1201-K |
Twelfth |
Under Process
|
Yes
|
107.00 |
Annu Kumari |
|
550
|
D1-1202-H |
Twelfth |
Under Process
|
Yes
|
89.00 |
Ankit Malaviya |
|
551
|
D1-1203-I |
Twelfth |
Under Process
|
Yes
|
108.00 |
Reecha and George Sinha |
|
552
|
D1-1204-J |
Twelfth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
553
|
D2-1205-2G |
Twelfth |
Under Process
|
Yes
|
89.00 |
Amit Kumar and Kirti Kaushal |
|
554
|
D2-1206-1F |
Twelfth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
555
|
D2-1207-1G |
Twelfth |
Under Process
|
No
|
108.00 |
Rajesh Ram Sahu |
|
556
|
D2-1208-D |
Twelfth |
Under Process
|
No
|
89.00 |
Nanku Sahu |
|
557
|
D3-1209-C |
Twelfth |
Under Process
|
Yes
|
89.00 |
Vishal Chandra and Priyanka Sharma |
|
558
|
D3-1210-B |
Twelfth |
Under Process
|
Yes
|
107.00 |
Varsha Pradeep |
|
559
|
D3-1211-A |
Twelfth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
560
|
D1-1301-K |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
561
|
D1-1302-H |
Thirteenth |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
562
|
D1-1303-I |
Thirteenth |
Under Process
|
Yes
|
108.00 |
Biranchi Narayan |
|
563
|
D1-1304-J |
Thirteenth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
564
|
D2-1305-2G |
Thirteenth |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
565
|
D2-1306-1F |
Thirteenth |
Under Process
|
No
|
108.00 |
Moti Infraheights Pvt Ltd |
|
566
|
D2-1307-1G |
Thirteenth |
Under Process
|
No
|
108.00 |
Rajesh Ram Sahu |
|
567
|
D2-1308-D |
Thirteenth |
Under Process
|
No
|
89.00 |
Rajesh Ram Sahu |
|
568
|
D3-1309-C |
Thirteenth |
Under Process
|
No
|
89.00 |
Moti Infraheights Pvt Ltd |
|
569
|
D3-1310-B |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
570
|
D3-1311-A |
Thirteenth |
Under Process
|
No
|
107.00 |
Moti Infraheights Pvt Ltd |
|
571
|
Tower - E - E-001-G1 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
572
|
E-002-G2 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
573
|
E-003-G3 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
574
|
E-004-G4 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
575
|
E-005-G5 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
576
|
E-006-G6 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
577
|
E-007-G7 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
578
|
E-008-G8 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
579
|
E-009-G9 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
580
|
E-010-G10 |
Ground |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
581
|
E-011-G1 |
Ground |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
582
|
E-101-1 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
583
|
E-102-2 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
584
|
E-103-3 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
585
|
B3-707-B7 |
Seventh |
Under Process
|
No
|
99.00 |
Gautam Kumar and Pritam Kumar |
|
586
|
B3-708-B8 |
Seventh |
Under Process
|
No
|
99.00 |
Gautam Kumar and Pritam Kumar |
|
587
|
B3-709-B9 |
Seventh |
Under Process
|
No
|
99.00 |
Gautam Kumar and Pritam Kumar |
|
588
|
B4-710-B10 |
Seventh |
Under Process
|
Yes
|
89.00 |
Piyush Ranjan Kumar and Swati Kumari |
|
589
|
B4-711-B11 |
Seventh |
Under Process
|
No
|
89.00 |
Lalchand Sahu |
|
590
|
B4-712-B12 |
Seventh |
Under Process
|
No
|
61.00 |
Sunita Devi |
|
591
|
B4-713-B15 |
Seventh |
Under Process
|
Yes
|
89.00 |
Sangeeta Kumari and pragya Piyush |
|
592
|
B4-714-B14 |
Seventh |
Under Process
|
No
|
99.00 |
Neelu Ram |
|
593
|
B4-715-B13 |
Seventh |
Under Process
|
No
|
61.00 |
Sunita Devi |
|
594
|
B1-801-B2 |
Eighth |
Under Process
|
Yes
|
99.00 |
Shilkee Khatri and Santosh Mehta |
|
595
|
B1-802-B1 |
Eighth |
Under Process
|
No
|
99.00 |
Geeta Devi |
|
596
|
B1-803-B3 |
Eighth |
Under Process
|
No
|
89.00 |
Gautam Kumar and Pritam Kumar |
|
597
|
B2-804-B4 |
Eighth |
Under Process
|
No
|
85.00 |
Shrawan Sahu |
|
598
|
B2-805-B5 |
Eighth |
Under Process
|
No
|
85.00 |
Shankar Sahu |
|
599
|
B2-806-B6 |
Eighth |
Under Process
|
No
|
85.00 |
Arvind Kishore Ram |
|
600
|
B3-807-B7 |
Eighth |
Under Process
|
No
|
99.00 |
Gautam Kumar and Pritam Kumar |
|
601
|
B3-808-B8 |
Eighth |
Under Process
|
No
|
99.00 |
Gautam Kumar and Pritam Kumar |
|
602
|
B3-809-B9 |
Eighth |
Under Process
|
No
|
99.00 |
Gautam Kumar and Pritam Kumar |
|
603
|
B4-810-B10 |
Eighth |
Under Process
|
Yes
|
89.00 |
Pawan Kumar |
|
604
|
B4-811-B11 |
Eighth |
Under Process
|
No
|
89.00 |
Lalchand Sahu |
|
605
|
B4-812-B12 |
Eighth |
Under Process
|
No
|
61.00 |
Anita Kumari |
|
606
|
B4-813-B15 |
Eighth |
Under Process
|
No
|
89.00 |
Ashish Kumar and Prakash Saurav |
|
607
|
B4-814-B14 |
Eighth |
Under Process
|
No
|
99.00 |
Ashish Kumar and Prakash Saurav |
|
608
|
B4-815-B13 |
Eighth |
Under Process
|
No
|
61.00 |
Anita Kumari |
|
609
|
B1-901-B2 |
Ninth |
Under Process
|
Yes
|
99.00 |
Rajesh Kumar |
|
610
|
B1-902-B1 |
Ninth |
Under Process
|
Yes
|
99.00 |
Anju Sinha |
|
611
|
B1-903-B3 |
Ninth |
Under Process
|
Yes
|
89.00 |
Naveen Kumar and Aryan Bhardwaj |
|
612
|
B2-904-B4 |
Ninth |
Under Process
|
Yes
|
85.00 |
Mamta Singh and Anika Singh |
|
613
|
B2-905-B5 |
Ninth |
Under Process
|
Yes
|
85.00 |
Gargi |
|
614
|
B2-906-B6 |
Ninth |
Under Process
|
No
|
85.00 |
Arvind Kishore Ram |
|
615
|
B3-907-B7 |
Ninth |
Under Process
|
No
|
99.00 |
Chandan Kumar |
|
616
|
B3-908-B8 |
Ninth |
Under Process
|
No
|
99.00 |
Chandan Kumar |
|
617
|
B3-909-B9 |
Ninth |
Under Process
|
No
|
99.00 |
Chandan Kumar |
|
618
|
B4-910-B10 |
Ninth |
Under Process
|
No
|
89.00 |
Karamchand Kumar |
|
619
|
B4-911-B11 |
Ninth |
Under Process
|
No
|
89.00 |
Dharamchand Kumar |
|
620
|
B4-912-B12 |
Ninth |
Under Process
|
No
|
61.00 |
Ashish Kumar and Prakash Saurav |
|
621
|
B4-913-B15 |
Ninth |
Under Process
|
Yes
|
89.00 |
Piyush Kumar Pankaj and Sapna Kumari |
|
622
|
B4-914-B14 |
Ninth |
Under Process
|
Yes
|
99.00 |
Narayan Sah and Sunita Sah |
|
623
|
B4-915-B13 |
Ninth |
Under Process
|
No
|
61.00 |
Shivendra Kumar Yadav and others |
|
624
|
B1-1001-B2 |
Tenth |
Under Process
|
Yes
|
99.00 |
Prabhat Kumar Mehta |
|
625
|
B1-1002-B1 |
Tenth |
Under Process
|
No
|
99.00 |
Chetan Kumar |
|
626
|
B1-1003-B3 |
Tenth |
Under Process
|
No
|
89.00 |
Shivratan Sahu |
|
627
|
E-104-4 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
628
|
E-105-5 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
629
|
E-106-6 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
630
|
E-107-7 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
631
|
E-108-8 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
632
|
E-109-9 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
633
|
E-110-10 |
First |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
634
|
E-111-11 |
First |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
635
|
E-201-1 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
636
|
E-202-2 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
637
|
E-203-3 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
638
|
E-204-4 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
639
|
E-205-5 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
640
|
E-206-6 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
641
|
E-207-7 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
642
|
E-208-8 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
643
|
E-209-9 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
644
|
E-210-10 |
Second |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
645
|
E-211-11 |
Second |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
646
|
E-301-1 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
647
|
E-302-2 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
648
|
E-303-3 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
649
|
E-304-4 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
650
|
E-305-5 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
651
|
E-306-6 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
652
|
E-307-7 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
653
|
E-308-8 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
654
|
E-309-9 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
655
|
E-310-10 |
Third |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
656
|
E-311-11 |
Third |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
657
|
E-401-1 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
658
|
E-402-2 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
659
|
E-403-3 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
660
|
E-404-4 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
661
|
E-405-5 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
662
|
E-406-6 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
663
|
E-407-7 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
664
|
E-408-8 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
665
|
E-409-9 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
666
|
E-410-10 |
Fourth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
667
|
E-411-11 |
Fourth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
668
|
E-501-1 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
669
|
E-502-2 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
670
|
E-503-3 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
671
|
E-504-4 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
672
|
E-505-5 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
673
|
E-506-6 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
674
|
E-507-7 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
675
|
E-508-8 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
676
|
E-509-9 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
677
|
E-510-10 |
Fifth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
678
|
E-511-11 |
Fifth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
679
|
E-601-1 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
680
|
E-602-2 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
681
|
E-603-3 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
682
|
E-604-4 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
683
|
E-605-5 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
684
|
E-606-6 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
685
|
E-607-7 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
686
|
E-608-8 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
687
|
E-609-9 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
688
|
E-610-10 |
Sixth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
689
|
E-611-11 |
Sixth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
690
|
E-701-1 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
691
|
E-702-2 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
692
|
E-703-3 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
693
|
E-704-4 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
694
|
E-705-5 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
695
|
E-706-6 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
696
|
E-707-7 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
697
|
E-708-8 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
698
|
E-709-9 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
699
|
E-710-10 |
Seventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
700
|
E-711-11 |
Seventh |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
701
|
E-801-1 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
702
|
E-802-2 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
703
|
E-803-3 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
704
|
E-804-4 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
705
|
E-805-5 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
706
|
E-806-6 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
707
|
E-807-7 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
708
|
E-808-8 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
709
|
E-809-9 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
710
|
E-810-10 |
Eighth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
711
|
E-811-11 |
Eighth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
712
|
E-901-1 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
713
|
E-902-2 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
714
|
E-903-3 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
715
|
E-904-4 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
716
|
E-905-5 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
717
|
E-906-6 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
718
|
E-907-7 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
719
|
E-908-8 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
720
|
E-909-9 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
721
|
E-910-10 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
722
|
E-911-11 |
Ninth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
723
|
E-1001-1 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
724
|
E-1002-2 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
725
|
E-1003-3 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
726
|
E-1004-4 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
727
|
E-1005-5 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
728
|
E-1006-6 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
729
|
E-1007-7 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
730
|
E-1008-8 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
731
|
E-1009-9 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
732
|
E-1010-10 |
Tenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
733
|
E-1011-11 |
Tenth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
734
|
E-1101-1 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
735
|
E-1102-2 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
736
|
E-1103-3 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
737
|
E-1104-4 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
738
|
E-1105-5 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
739
|
E-1106-6 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
740
|
E-1107-7 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
741
|
E-1108-8 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
742
|
E-1109-9 |
Ninth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
743
|
E-1110-10 |
Eleventh |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
744
|
E-1111-11 |
Eleventh |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
745
|
E-1201-1 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
746
|
E-1202-2 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
747
|
E-1203-3 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
748
|
E-1204-4 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
749
|
E-1205-5 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
750
|
E-1206-6 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
751
|
E-1207-7 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
752
|
E-1208-8 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
753
|
E-1209-9 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
754
|
E-1210-10 |
Twelfth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
755
|
E-1211-11 |
Twelfth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
756
|
E-1301-1 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
757
|
E-1302-2 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
758
|
E-1303-3 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
759
|
E-1304-4 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
760
|
E-1305-5 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
761
|
E-1306-6 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
762
|
E-1307-7 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
763
|
E-1308-8 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
764
|
E-1309-9 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
765
|
E-1310-10 |
Thirteenth |
Under Process
|
No
|
29.00 |
Moti Infraheights Pvt Ltd |
|
766
|
E-1311-11 |
Thirteenth |
Under Process
|
No
|
46.00 |
Moti Infraheights Pvt Ltd |
|
767
|
Club House - CH - G1 |
Ground |
Under Process
|
No
|
492.61 |
Moti Infraheights Pvt Ltd |
|
768
|
CH-G2 |
Ground |
Under Process
|
No
|
24.00 |
Moti Infraheights Pvt Ltd |
|
769
|
CH - 1A |
First |
Under Process
|
No
|
452.00 |
Moti Infraheights Pvt Ltd |
|
770
|
CH - 2A |
Second |
Under Process
|
No
|
378.00 |
Moti Infraheights Pvt Ltd |
|
771
|
CH - 3A |
Third |
Under Process
|
No
|
199.00 |
Moti Infraheights Pvt Ltd |
|
772
|
CH - 3B |
Third |
Under Process
|
No
|
54.00 |
Moti Infraheights Pvt Ltd |
|
773
|
CH - 3C |
Third |
Under Process
|
No
|
35.00 |
Moti Infraheights Pvt Ltd |
|
774
|
CH - 3D |
Third |
Under Process
|
No
|
51.00 |
Moti Infraheights Pvt Ltd |
|
775
|
tower A1-303-15 |
Third |
Under Process
|
No
|
125.00 |
Gautam Kumar and Pritam Kumar |
|
776
|
A3-808-2 |
Eighth |
Under Process
|
Yes
|
169.00 |
Shashank and Punam Sahu |
|
777
|
TOWER C-003-GB |
Ground |
Under Process
|
Yes
|
169.00 |
Shubha and Ambuj Anand |
|
778
|
TOWER D3-909-C |
Ninth |
Under Process
|
Yes
|
89.00 |
Ankit Kumar Verma |